Skip to content
Axiscore | Procurement, solved — one list, one quote, one accountable partner.
 

Gridded Magnetic Steel Dry Erase Project Planning Board, 1" x 2" Cells, 72" x 48", White Surface, Satin Aluminum Frame

SKU BVCMA2792830

More Info

$608.86
$487.09/EA+ $14.21 shipping
In Stock
Delivered by
Estimated delivery for orders placed today
Returnable
Standard return policy applies

Product Description

Gridded Magnetic Steel Dry Erase Project Planning Board, 1" x 2" Cells, 72" x 48", White Surface, Satin Aluminum Frame.

Organization is vital for the success of every business or enterprise. Planning boards are excellent tools that allow you to keep planning and tracking on time. Keeping important tasks on display, organizing work-groups or just planning ahead is practical and easy. Pale gray grid lines help ensure easy alignment of text and magnetic accessories. Magnetic lacquered steel dry erase surface is suitable for frequent use and allows you to post notes and messages as well as write. Sturdy aluminum frame features a sliding pen tray and an easy four-corner mounting system. Includes mounting kit.

Why customers choose this product

  • Magnetic Gold Ultra™ lacquered steel dry erase surface is recommended for frequent use.
  • Pale gray grid lines make planning easy and make for a professional-looking board.
  • Sliding aluminum pen tray keeps pens and magnetic accessories where you want them.
  • Four-corner system for easy mounting.

What's in the package

Accessory Tray/Rail; Mounting Kit

Technical Specifications

Board Surface Type(s) Dry Erase
Global Product Type Preformatted Dry Erase Boards
Magnetic Board Surface Yes
Surface Use Rating Heavy/Frequent Use
Surface Material Gold Ultra™ Lacquered Steel
Surface Color White
Dedicated Projection Screen No
Flipchart Mounting System No
Frame Material Aluminum
Frame Color/Finish Satin
Board Width 72"
Board Height 48"
Preformatted Board Surface Yes
Preformatted Surface Details Project Planning & Tracking Spreadsheet (1" x 2" Cells)
Supports Custom Surface Formatting No
Grid Columns 35
Grid Rows 47
Mounting Details Four-Corner Wall-Mount System (Included)
Package Includes Accessory Tray/Rail; Mounting Kit
Compliance Standards ISO 9001-2008
Pre-Consumer Recycled Content Percent 0%
Post-Consumer Recycled Content Percent 0%
Total Recycled Content Percent 0%
Items you are comparing
  •  
  •  
  •  
  •  
Compare Products Clear All

You can only compare four products at once

×
Welcome Newcomer