Gridded Magnetic Steel Dry Erase Project Planning Board, 1" x 2" Cells, 36" x 24", White Surface, Satin Aluminum Frame
$74.46
$59.57/EA
Free Shipping
On all orders, contiguous US
Delivered by —
Estimated delivery for orders placed today
Returnable
Standard return policy applies
Product Description
Gridded Magnetic Steel Dry Erase Project Planning Board, 1" x 2" Cells, 36" x 24", White Surface, Satin Aluminum Frame.
Organization is vital for the success of every business or enterprise. Planning boards are excellent tools that allow you to keep planning and tracking on time. Keeping important tasks on display, organizing work-groups or just planning ahead is practical and easy. Pale gray grid lines help ensure easy alignment of text and magnetic accessories. Magnetic lacquered steel dry erase surface is suitable for frequent use and allows you to post notes and messages as well as write. Sturdy aluminum frame features a sliding pen tray and an easy four-corner mounting system. Includes mounting kit.
Why customers choose this product
- Magnetic Gold Ultra™ lacquered steel dry erase surface is recommended for frequent use.
- Pale gray grid lines make planning easy and make for a professional-looking board.
- Sliding aluminum pen tray keeps pens and magnetic accessories where you want them.
- Four-corner system for easy mounting.
What's in the package
(10) Card Holders; (1) Set of Magnetic Shapes; Accessory Tray; Mounting Kit
Technical Specifications
| Board Surface Type(s) | Dry Erase |
|---|---|
| Global Product Type | Preformatted Dry Erase Boards |
| Magnetic Board Surface | Yes |
| Surface Use Rating | Heavy/Frequent Use |
| Surface Material | Gold Ultra™ Lacquered Steel |
| Surface Color | White |
| Dedicated Projection Screen | No |
| Flipchart Mounting System | No |
| Frame Material | Aluminum |
| Frame Color/Finish | Satin |
| Board Width | 36" |
| Board Depth | 0.98" |
| Board Height | 24" |
| Preformatted Board Surface | Yes |
| Preformatted Surface Details | Project Planning & Tracking Spreadsheet (1" x 2" Cells) |
| Supports Custom Surface Formatting | No |
| Grid Columns | 17 |
| Grid Rows | 23 |
| Mounting Details | Four-Corner Wall-Mount System (Included) |
| Package Includes | (10) Card Holders; (1) Set of Magnetic Shapes; Accessory Tray; Mounting Kit |
| Compliance Standards | ISO 9001-2008 |
| Pre-Consumer Recycled Content Percent | 0% |
| Post-Consumer Recycled Content Percent | 0% |
| Total Recycled Content Percent | 0% |
You can only compare four products at once


















